合肥市第三人民医院组织机构设置
文印室
档案室 院办公室
驾驶班 组织人事处
医务处 病案室 科教处 图书室
部
质控办
财务处 绩效考核办 医保办
卫防处 计免室 院感科
信息处
门诊部
行政职能科室 审计处
监察室
宣教处
社区工作处
总务外
工会
计生办
团委
物资中心
基建办
营养科
老干办
保卫处
installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before
普外科 烧伤整形科 心胸外科 神经外科 泌尿外科
外科 骨科
妇科
产科
眼科
耳鼻咽候科 口腔科 麻醉科 呼吸内科 临床科室
消化内科 神经内科 心血管内科 肿瘤科 血液内科
内科 肾内科 内分泌科
儿科
重症医学科
针炙科 中医科
推拿科 职业病科 康复医学科 急诊科 皮肤科
installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before
放射科
CT室 影像中心
磁共振室 检验科
血库
药剂科
病理科 肌电
超声 功能检查科 心电
脑电
TCD 供应室
医技科室
胃镜 内镜中心 肠镜
喉镜
支气管镜 体检中心
installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before